Get in touch with UD Packaging Company Contact Form 使用ä¸Your Name *EmailPhone/WhatsAppYour MessageSubmit Form
Building-Packaging Total-Cost Input Worksheet Home – Industries – Construction & Building – Building-Packaging Total-Cost Worksheet Building-Packaging Total-Cost Input Worksheet Compare a current packaging system with a candidate system using only your own costs and measured consumption. Every field starts blank, the currency is neutral, and the result is arithmetic rather than a UD Packaging savings promise. 01 Global Production Volume Unit loads packed per year Loaded labor cost per hour 02 Scenario Comparison Parameters Current System Strap cost per roll Usable length per roll (m) Strap used per load (m) Packing labor per load (min) Roll-change time (min) Annual tool, seal & maintenance cost Annual damage, rework & stoppage Candidate System Strap cost per roll Usable length per roll (m) Strap used per load (m) Packing labor per load (min) Roll-change time (min) Annual tool, seal & maintenance cost Annual damage, rework & stoppage Calculate Total Cost Difference Clear Form 03 Annual Arithmetic Comparison Current System Total— Candidate System Total— Variance (Current – Candidate)— Input category Current Candidate
Current System Strap cost per roll Usable length per roll (m) Strap used per load (m) Packing labor per load (min) Roll-change time (min) Annual tool, seal & maintenance cost Annual damage, rework & stoppage
Candidate System Strap cost per roll Usable length per roll (m) Strap used per load (m) Packing labor per load (min) Roll-change time (min) Annual tool, seal & maintenance cost Annual damage, rework & stoppage
WhatsApp / WeChat+86 188 9652 1007Same number for quick questions and photos. EmailCandy.chen@udpackaging.comUD Packaging sales contact.