Record what happens on the intended tool and loaded package. The checklist does not impose universal thresholds; your written acceptance criteria determine release.
Feed and equipment fit
Tension and package contact
Joint performance
Loaded-package observation
Trial record summary
Keep the trial roll label, specification, machine settings, package description and observation date with the approval record. A count of acceptable items does not override a safety-critical review item.